Should vertical corrugated pipe be directly connected to perforated corrugated perimeter drain with a tee in perimeter drain and vertical pipe inserted into tee
or
should vertical corrugated pipe stop short of perforated corrugated perimeter drain about 3” or 4” in the pea gravel around perforated corrugated perimeter drain and water would flow thru gravel into perforated perimeter drain pipe?
or
should vertical corrugated pipe stop short of perforated corrugated perimeter drain about 3” or 4” in the pea gravel around perforated corrugated perimeter drain and water would flow thru gravel into perforated perimeter drain pipe?