Started work on my new electrical service . Meter base mounted SERVICE MAST INSTALLED AND CUT OFF .
Could not find my weather head . Slipped the service jack down over the conduit , but have not " dryed it in " with screws and black asphalt "pooky " .
Next I need to install the cables / wires up the mast and cap the mast with a weather head .
Then drive a ground rod and run the ground wire .
God bless
Wyr
Could not find my weather head . Slipped the service jack down over the conduit , but have not " dryed it in " with screws and black asphalt "pooky " .
Next I need to install the cables / wires up the mast and cap the mast with a weather head .
Then drive a ground rod and run the ground wire .
God bless
Wyr