I'm trying to level my kitchen floor. I made 2x8 beam out of 3 2x8 10 foot boards. Bolted it together and screwed it. Then I measured the joists some are 2x10 and some are 2x8. How do I fill in those gaps? I tried using ripped 2x4s but they cannot with stand the force I'm lost don't know what to do from here