- Joined
- Feb 4, 2022
- Messages
- 1
- Reaction score
- 0
- Country
Help! Planning a basement remodeling project. My basement is already roughed in, but right above the shower is duct work about 7ft 1inch above the floor
Should I
1) install the shower with a 6foot10 inch height or
2) jackhammer the floor and relocate to a higher ceiling height of about 7 ft 10 inches. The floor to ceiling is 8ft in other areas
Should I
1) install the shower with a 6foot10 inch height or
2) jackhammer the floor and relocate to a higher ceiling height of about 7 ft 10 inches. The floor to ceiling is 8ft in other areas
Attachments
-
156.9 KB Views: 9