Hello all,

I am installing artificial grass in my backyard. 6 weeks ago, I filled the area with base rocks to form the sub-base (3" depth). Then vacation and work got in the way and I couldn't continue the work. Now I am ready to put the leveling sand on top (1" depth). Given the sub-base was sitting there for 6 weeks and there was a bit of rain during that time, does it still need to be compacted with a plate vibrator? I am wondering whether the sub-base has settled on its own by now.

I don't have a plate vibrator and going to rent one, plus renting a truck to bring it home is a big hassle. If I can avoid it, it's a big plus.

Thank you in advance for your input
 
Joined
May 15, 2021
Messages
397
Reaction score
47
Country
Canada
In my experience pouring concrete (years ago), if the base has settled for 6 weeks or so, I'd say it's ok. When you say "base rocks", do you mean 3/4" sanded road gravel (NOT WASHED)?
 
Joined
Apr 11, 2021
Messages
5
Reaction score
0
Country
United States
In my experience pouring concrete (years ago), if the base has settled for 6 weeks or so, I'd say it's ok. When you say "base rocks", do you mean 3/4" sanded road gravel (NOT WASHED)?
Thanks for your reply AC Power. I purchased "recycled baserocks" which is crushed concrete (about 3/4" size). It has the small "rocks" but also mixed w/ a good amount of the concrete "sand". It looks pretty compacted to me except for the loose rocks on the surface.
 

Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments. After that, you can post your question and our members will help you out.

Ask a Question

Members online

No members online now.

Forum statistics

Threads
128,916
Messages
1,266,497
Members
10,642
Latest member
ArcadePunk

Latest Threads

Top