- Joined
- May 11, 2019
- Messages
- 1
- Reaction score
- 0
- Country
Hello! this is my first post in this amazing forum.
I'm facing some problems while setting up the centralized payment system with some these Miele machines.
The particular model is PW6065.
I understand that there is a connector with 7 poles. The first two (1 & 2) are used to set start permitted.
Number 6 should be earth ground
I have the following doubts:
1) In which pin can we read the occupation information, and how?
2) Does the machine provide the voltage supply for the connection of pin 1 and 2 during the start permitted configuration?
Thanks a lot!
Best regards,
Pedro.
I'm facing some problems while setting up the centralized payment system with some these Miele machines.
The particular model is PW6065.
I understand that there is a connector with 7 poles. The first two (1 & 2) are used to set start permitted.
Number 6 should be earth ground
I have the following doubts:
1) In which pin can we read the occupation information, and how?
2) Does the machine provide the voltage supply for the connection of pin 1 and 2 during the start permitted configuration?
Thanks a lot!
Best regards,
Pedro.